Building Safety
Risk Management

One platform for the safety case of every higher-risk building, covering golden-thread documents, statutory compliance, audits, occurrence reporting, remediation and the full Safety Case Report.

Built for Accountable Persons, building safety managers and developers.

Ashcombe Tower
HRB
Safety case86% complete
Documents
12 / 15 held
Compliance
Up to date
Audits
Reviewed 14d ago
Actions
3 open
Safety Case Report
Draft v4
5
Safety workstreams
15
Document types
~145
Audit checkpoints
Unlimited
Clients & portfolios
The five workstreams

The building at the centre of everything

Every higher-risk building sits at the heart of its own safety case, with each workstream orbiting it — switched on per building, and rolling straight back up into one record. Each one is a complete tool in its own right.

Plus the core on every building: Overview · Documents · Compliance · MORs · Actions · Audits.

Your HRB
Building Safety Case
Resident Engagement
Remediation
Fire Doors
Lifts
Explore each workstream

A closer look at all five

What each workstream does and how it earns its place in the safety case — step through them below, or jump straight to the one you need.

Building Safety Case

The Safety Case Report, drafted for you

The centrepiece of the safety case, and the most demanding document to produce. SafetyHalo turns it into a living, version-controlled record — and lets AI do the heavy lifting.

AI autocomplete

Draft any field in seconds. SafetyHalo reads the building’s uploaded evidence — FRAs, fire strategy, plans — and proposes the wording for you to review and accept.

Write once, apply across

Reuse a field across the client. Apply a value to selected buildings, or every building in the portfolio, in one step with a preview before it lands.

Version-controlled

Each new version locks the last as a permanent, read-only record, with a track-changes log of who changed what and when.

Branded A4 export

Rich text, tables and flowcharts reflow across branded A4 pages. View it, edit it live, print it and export to PDF.

Building Safety Case Report
v4 · Editing

Fire strategy summary

The building is served by a single protected stair with a dry riser to each level. Evacuation follows a stay-put strategy, supported by the fire-resisting compartment walls and an L2 detection system covering common parts…

Drafted by AI from Fire Strategy.pdf and the building’s FRA. Review and accept.
Apply this field across
12 buildings →
v4 saved · 3 fields changed · today
Resident Engagement

Engagement, documented and provable

Run your Resident Engagement Strategy with resident panels and a logged communications history that proves you are listening and acting.

Resident panels

Maintain panel membership and roles for every building, kept current as residents change.

Communications log

Every notice, meeting and response captured and time-stamped, so engagement is always provable.

Versioned strategy

Your RES evolves as a template-driven document, with each version preserved as a record.

A4 strategy report

Export the full Resident Engagement Strategy as a branded, print-ready A4 document.

Resident Engagement Strategy
v2

Resident panel

JM

Jane Mills

Lead representative
RK

Raj Khan

Floors 6–10
SD

Sara Doyle

Accessibility lead

Communications log

Quarterly safety update issued3 Jun
Panel meeting minutes shared21 May
Lift maintenance notice posted9 May
Remediation

Track works from survey to sign-off

Organise remediation workstreams and their individual items against a quarterly programme timeline, with clear progress tracked across every building in the portfolio.

Workstreams & items

Break each programme into workstreams and checklist items, each with its own status.

Programme timeline

Plan delivery across quarterly milestones and see the whole programme at a glance.

Live progress

Completion is derived automatically as items are closed out, with no manual tallying.

Portfolio rollup

Compare remediation progress across every building from a single view.

Remediation Programme
62% complete
Cladding replacement80%
Compartmentation55%
Fire stopping40%

Programme timeline

Q3 25
Q4 25
Q1 26
Q2 26
Fire Doors

Every door, inspected and accounted for

Schedule and record fire-door inspections building by building, with the next inspection date always in view and a complete history behind every door.

Door register

A complete inventory of fire doors per building, by location and reference.

Inspection scheduling

Set inspection frequencies and surface exactly what is due, building by building.

Pass / action records

Record each inspection outcome with notes and evidence held against the door.

Due-date tracking

The next inspection date is always in view, so nothing lapses unnoticed.

Fire Door Inspections
Next due 14 Jul
FD-01Ground-floor lobby12 Apr
FD-07Level 4 corridor12 Apr
FD-12Level 8 riser12 Apr
FD-18Roof plant room12 Apr
48 doors tracked · 3 due this quarter
Lifts

LOLER and maintenance, always on schedule

Keep lift LOLER examinations and maintenance visits on track, with due dates and records held against each building and surfaced before they fall due.

LOLER examinations

Track thorough examinations and their due dates for every lift in the building.

Maintenance visits

Log routine servicing and keep the full maintenance history in one place.

Defect tracking

Capture defects raised at examination and follow them through to resolution.

Due-date alerts

Upcoming examinations are surfaced early, so certificates never expire.

Lift Compliance
LOLER current

Passenger lift 1

LOLER examination

Due 02 Sep

Passenger lift 2

LOLER examination

Due 02 Sep

Goods lift

Thorough examination

Due 18 Jul
Thorough examination every 6 months
Delivery & oversight

From project, to task, to building — and back into one report

The workstreams are the what. Projects are how the work gets done — a delivery pipeline that breaks down into owned, deadline-tracked tasks against real buildings, with milestones keeping everything in check and reporting waiting at the end.

01

Projects

Every piece of delivery work — a remediation programme, a safety-case production, a review — runs as a project with its own pipeline stage, milestones, billing and contacts.

02

Tasks

Each project breaks down into tasks with an owner, a deadline and a RAG status, linked to the exact building and workstream they move forward.

03

Buildings

Projects span one or many higher-risk buildings, and every task ties back to the building it belongs to — so nothing floats free of its safety case.

04

Reporting

Progress, milestones and actions roll up the chain into clear, exportable reports — from a single building to your whole book of business.

The pipeline and its milestones, kept in check

Watch every project move through its stages, with the milestone timeline showing exactly where each one stands — kick-off, draft, consultation, report sent, complete. Deadlines carry a RAG status so anything slipping is impossible to miss.

  • Pipeline board

    Drag work across prospect, planned, live, review and complete.

  • Spreadsheet

    A dense, sortable grid of every task and deadline when you want the detail.

  • Calendar

    Deadlines and milestones laid out by date, so nothing slips.

Aldgate portfolio · Delivery

Planned

1

FRAEW survey

Aldgate Lodge

Live

2

Safety Case v4

Thornbury Hts

EWS1 remediation

Quay House

Review

1

RES refresh

Beacon Place

Milestones — Safety Case v4

2 of 5
Kick-off
Draft issued
Consultation
Report sent
Complete
Built into every building

And the core, on every building

Whichever workstreams you run, every building ships with the essentials — documents, compliance, occurrence reporting, actions and audits, all in one place.

Overview

Building identity, live status, the Principal Accountable Person, regulatory position and key contacts, on a Street-View hero for every building.

Documents

Track all 15 statutory document types per building — GAP, Plans, Structural, Type 2 FRA, FRAEW, Fire Strategy and more — and see what is held and what is outstanding.

Compliance

A clear matrix of every recurring statutory inspection — FRA, fire doors, risers, gas, lift LOLER, EICR, legionella, asbestos — with the next due date for every building.

MORs

Capture, draft and submit Mandatory Occurrence Reports to the regulator, with notification status and a complete, defensible audit trail.

Actions

A prioritised action tracker that ties every finding to an owner, a source and a due date, so nothing slips through the cracks.

Audits

Template-driven safety-case audits with conditional logic, evidence capture, a full change log and a printable A4 audit report.

Built to manage safety at scale

From a single building to hundreds across dozens of clients, SafetyHalo keeps every safety case organised, reportable and consistent.

Manage every client

Run unlimited client portfolios side by side, each kept separate and organised. Built for managing agents, consultancies and landlords with buildings across many clients.

Reporting at every level

Roll compliance, audits and actions up from one building to an entire client, or your whole book of business, and export it as a polished report.

Templates you control

Tailor the audit checklist and the Safety Case Report to your own standards. Adjust the template once and every building works to the same brief.

Set once, cascade everywhere

Define a client’s compliance set and settings a single time and cascade them across every building in that client, with no repetitive per-building setup.

See your safety case in SafetyHalo

Book a walkthrough and we'll show you how every module comes together for a real higher-risk building, from the golden thread to the full Safety Case Report.